Laserfiche WebLink
.. 1 ~ .~ ~ ,. • • ' <br />1 .i <br />EXHIBIT H: MINING PLAN °CONTINUID" <br />b) Excavate and remove to the construction project any <br />needed overburden material. <br />c) Stockpile any excess overburden which was not utilized <br />in the construction project, The overburden is a <br />sandy type material with an average depth of approximately <br />three feet. <br />d) Excavate the useable sand and gravel, xhich averages <br />approximately six feet in depth, and process it over <br />a screen xhich eliminates any oversize material. Then <br />the material x111 be stockpiled. <br />e) The stockpiled Band and gravel x111 be processed <br />through a plant xhere it is mixed with asphalts and <br />from the plant it x111 be hauled directly to the <br />construction site by truck. <br />f) At the completion of the operation the site x111 be <br />reclaimed in accordance xith the reclamation plan. <br />• <br />g) At this time it is anticipated the xork xill commence <br />Sn July of 1977 xith approximately 100 days being <br />alloxed to complete the xork. <br />