Laserfiche WebLink
til ~ <br />r <br />~xxrr~.ert ~Xxt~r ~.ssocttt~>es <br />CONSULTING GEOTECHNICAL ENGINEERS AND MATERIAL TESTING <br />DAILY FIELD REPORT <br />PROJECT NUMBER: M0404$MT DATE: Friday, 4-16-04 <br />PROJECT NAME: West Elk Mine, Gob Pile <br />PROJECT LOCATION: Somerset, CO <br />CLIENT: West Elk Mine <br />CONTRACTOR: West Elk Mine <br />WORK PERFORMED BY LAMBERT AND ASSOCIATES REPRESENTATIVE (AND REMARKS) <br />TECHNICIAN: Glendening <br />WEATHER CONDITIONS: Sunny <br />WORK REQUESTED: Density tests <br />FOREMAN: Henry Barbe <br />I arrived at the project site at 1:00 p.m., as requested by Henry Barbe. I performed soil density tests, as <br />requested by Mr. Barbe, of material being placed for gob pile fill, using nuclear soil density test methods. <br />Please refer to the test results sheet for approximate test locations and test results. The test area was <br />determined by Henry Barbe. The test results indicate only the relative compaction and soil moisture <br />content of the material tested at the elevation and location tested at the time of our site visit. <br />RECEIVED <br />MAY :~ 2004 <br />WEST ELK NI1NE <br />P.O. Box 3986 <br />Grand Junction, CO 81502 <br />(970) 245-6506 <br />FAX: (970) 248.9758 <br />P.O. Box 0045 <br />Montrose, CO 81402 <br />(970)249-2154 <br />FAX: (970)249 3262 <br />274 Bodo Drive <br />Durango, CO 81301 <br />(970)259-5095 <br />FAX: (970)382-2515 <br />