Laserfiche WebLink
2. Peak Flow <br />• Needs 7.3 cfs <br />Designed for 23.1 cfs <br />3. Freeboard <br />Needs at least 1.0 + 0.87 ft from bottom of spillway <br />Designed for 2.0 ft (Top height was increased in actual constuction from <br />drawing) <br />• <br />r 1 <br />.J <br />