Laserfiche WebLink
2. Peak Flow <br />• <br />Needs at least 8.9 cfs <br />Desiyned for 17.2 cfs <br />3. Freeboard <br />Needs at least 1.3 ft + 1.0 ft from bottom of spillway <br />Designed for 3.0 ft <br />• <br /> <br />