Laserfiche WebLink
6eah <br />• <br />41EST P1INE DIVERSIOPI -WEST LIt?B <br />Ditch Sizing <br />1. Q = 15.3 cfs <br />2. Rearrange Planning Equation <br />V=1n5P,2 S~ <br />3 <br />V = 1=55(x)- S'z <br />n P <br />(A)2/3 = (V n <br />P (1.5)(S~z) <br />A = (V n l z <br />P (1.5)(S z) 1 , <br />A _ <br />P - (V n z <br />(1.5)(S~~), <br />R=A/P <br />3. Solve for P if V = 5.0 ft/s => A = Q/V = 3.06 ftz <br />3.06 ft2 <br />P = f(5.0 ft/s (0.05 z <br />(1.5)(0.128)2 <br />4. Ditch Geometry <br />A = '-~~~~ <br />= 9.645 ft <br />x <br />y <br />z <br />P = Z + Y <br />X=2Y P= X-+Y +Y <br />• Assume Y and solve until P = 9.645 ft <br />If Y = 0.685' _> X = 8.934' _> P = 9.646' <br />