Laserfiche WebLink
• <br />• <br />1111111 1111111III IIII 1111111 I <br />999 <br />STATE OF COLORADO <br />DIVISION Of MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303)832-8106 <br />December 12, 2001 <br />DIVISION O F <br />MINERALS <br />GEOLOGY <br />0.EC LAM ATION <br />MINING•SAf ETY <br />D~~~7„ Bill Owens <br />''77 Governor <br />Gately Living Trust dba Seahorse Ranch <br /> <br />43980 E. Hwy. 50 #6 Greg E. Walther <br />Executive Director <br />GumusDn, CO 81230 Michael B. Long <br /> Division Director <br />Re: Sea Horse Ranch West Grave Pit, File No. M-2001-113, Receipt of 112 Constraction Materials <br />Reclamation Permit Application Package <br />Dear Ms. Gately: <br />On December 10, 2001, the Division of Minerals and Geology received additional materials to your 112 <br />Construction Materials Reclamation Permit Application package for the Sea Horse Ranch West Grave Pit, File No. <br />M-2001-113. Preliminary review of the information received determined that the following items must be received <br />before the Division can consider your application as being submitted and technical review can begin: <br />APPLICATION FORM: Page 7, Signatm-e Page: The Division regnires that the operator's signature be <br />witnessed by a Notary Public. <br />Your application will not be considered submitted until the information listed above is received and found sufficient <br />to begin our review. You have sixty (60) days from November 30, 2001 to submit all necessary documents that the <br />Office needs for an application to be considered tiled. If; at the end of the sixty day period, the application has not <br />been determined to be fled with the Office, the Off ce shall derry the application and terminate that application file. <br />A decision date will be established 90 days from the date of receipt of all of the requested information Additionally, <br />if you have ah'eady published notice you will need to republish notice, after the Division considers the application <br />submitted. This notice must be published once a week for four (4) consecutive weeks, starting within ten (10) days <br />of the date your application is considered submitted We will notify you when you should initiate republication of <br />your notice. The final date for receiving comments is the 20th day after the fourth publication or the next regulaz <br />business day. <br />This letter shall not be construed to mean that there aze no other technical deficiencies in your application The <br />Division will review your application to determine whether it is adequate to meet the requirements of the Act after <br />submittal of all required items. <br />Sincerely, <br />~f /~1r <br />SuzL~en <br />Program Assistant <br />ce: Kodi Cotten, American Concrete and Gravel, LLC, w/enclosures <br />