Laserfiche WebLink
<br /> <br />DIAL 99O-Z 922 ~ B U TA L ~- ~ <br />~{~NSTRUC~T110~1 <br />Reclamation Costs <br />P09T OFp~CE BOX B07 <br />SA LIDA, COLORADO 9130 <br />Our plan of stockpiling soil materials for use at the <br />completion of the project and then spreading to a <br />thickness of 8" deep adding cow manure fertilizer will <br />add the following costsi <br />Trucks to haul manure and stockpiles <br />160 ton needed or 16 loads at delivered price of <br />$20.00 per load or------------------------ $ 320.00. <br />977 Dozer to push stockpiled soil materials and manure <br />to disturbed areasi <br />8 hours at $45.00 or---------------------- $ 360.00. <br />Grader time for final grading will be done at this <br />time in lieu of doing it as outlined in Exhibit L. <br />Seeding program to be outlined in Exhibit L. <br />Total revised cost of reclamation <br />Original cost as stated------------------- <br />Seeding cost------------------------------ <br />Stockpile manure-------------------------- <br />Spread topsoil and manure----------------- <br />Revised total cost of reclamation--------- <br />- - '.~, <br />r ,' -- -' .. -- <br />EVERT CONSTRUCTION SER VICF <br />.ROM THE OP. FTINO B01gD TO TX6 BUII pINO <br />$2,079.50 <br />617.00 <br />320.00 <br />360.00 <br />$3,376.50 <br />/ Tl. ~ ~ 1 <br />