Laserfiche WebLink
~ OIAL l9p~2l22 <br />l9B~l 978 ~ <br />~ BUTAIA ~ <br />CO~STRUCT~~4N <br />Page -2- <br />• PORT OFFICE BO% p0] <br />SA LIDA, COLORADO Bt2ot <br />materials for soil build up. The stockpile of manure <br />will contain 160 tons or 20 ton per acre as recommended. <br />At completion of mining, we wi11 spread the soil materials <br />to a depth of 8" over all disturbed areas and seed the <br />area as described on page 14, Exhibit E-reclamation plan. <br />4. Water Resources. The complete mining operation will be <br />restricted from the present river course by a corridor <br />of 100' to 150' in width. This area will be left in its <br />present natural condition which is dry pit, therefore <br />the insiltation and pollution of stream will not occur. <br />5. Soils Information. The soil materials now at the site <br />does support vegetation, interspersed, as per vegetation <br />map and our reclamation plan calls for replacing the <br />same materials over disturbed areas along with cow manure <br />to build soil and promote vegetation. <br />6. Enclosed please find letter from Chaffee County marked <br />Supplement 2-B approving of our mining of sand and gravel. <br />Sincerely, <br />Butala Construction Company <br />by ~ .G~ <br />George eotokatos-Sec. <br />!~1 ~ Y ~ ~ ~ ~ J EVERY CONSTRUCTION SERVICE <br />\~~,` ~ -'~^C~ •fl OM THE ORA GTIN4 BO.flO TO THE BUILDING ~ ~~ '~~ '' ~ <br />