Laserfiche WebLink
<br />EXF:IBIT H - lining Plan <br /> <br />Rock, sand, and gravel will be removed from the 9.5 acre tract described <br />at EXHInIT A using bulldozers, frontloaders, and dumptrucks. It is intended <br />to operate in about a two to three acre area et a time in four phases as <br />follows: <br />Phase 1 - Remove and stockpile overourden ~ topsoil (see map at EXHIBIT C)~ <br />Phase 2 - Loed and transport desired material. <br />Phase 3 - Regrade the affected area so it will drain but not erode. <br />Phase 4 - P,eplece the topsoil, seed, fertilize, and mulch (see EXHIBIT E). <br />The mining operation will proceed generally north from Harrisville Road, <br />