Laserfiche WebLink
• SECTION 3.02.2 <br />DETERMINATION OF BOND AMOUNT <br />The amount of performance bond was jointly calculated by Erik Crosby from the Colorado <br />Division of Minerals and Geology and Ross Gubka from Western Fuels-Colorado. <br />A summary of the cost for New Horizon 1 and New Horizon 2 Mine can be seen in TABLE <br />3.02.2-1. The actual work sheets can be examined in Attachment 3.02.2-1 and 2. <br />• <br />• (REVISED JAN-26-01) 3.02.2-'I <br />