Laserfiche WebLink
GRAVEL PIT EXHIBIT "L" <br />I • <br />RECLAMATION COST <br />1 REPLACE OVERBURDEN <br />2 VERT. HIGHWALL REDUCTION <br />2 GRASS SEED MDC 50% FAILURE RATE <br />3 FERTILIZER- available N 8 P <br />4 TOPSOILING-SCRAPERBDOZER 25%SWELL <br />5 SCRIFIYING HARD PAN AREAS ONLY 5 ACRES <br />6 SEEDBED PREPARATION and PLANTING <br />7 MULCHING HAY or STRAW <br />8 WEED CONTROL <br />9 MOBILIZATION 8 DEMOBILIZATION <br />QTY. UNIT COST UNIT <br />2+sso $o.sa LCY <br />o $o.az LCY <br />20 s9o.2s ACRE <br />zo $s.eo ACRE <br />zo+s6 $o.se LCY <br />2azoo $o.oa SOYD <br />zo $+30.0o ACRE <br />20 $+70.00 ACRE <br />zo $3b.oo ACRE <br />2 $2,soo.oo LS <br />TOTAL DIRECT COST <br />INDIRECT COST OVERHEAD antl PROFIT <br />PUBLIC LIABILITY INSURANCE <br />CONTRACTOR PERFORMANCE BOND COST <br />CONTRACTOR PROFIT <br />DMG PROJECT ADMINISTRATION EXPENSE <br />TOTAL PERFORMANCE BOND AMOUNT <br />PROJECT NAME: VELARDE GRAVEL PIT <br />1.55% <br />1,55% <br />10.00% <br />5.00% <br />COST/ACRE <br />COST <br />$12,73+.00 <br />$0,00 <br />$1,805,20 <br />5116.00 <br />$N,697.44 <br />$968.00 <br />a2,soo.oo <br />$3,400.00 <br />$600.00 <br />$5,000.00 <br />$38,917.64 <br />$603.22 <br />$603.22 <br />$3,891,76 <br />$1,945.88 <br />$45,961.73 <br />$1,313.19 <br />• <br />