My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-12-03_PERMIT FILE - M2002118
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2002118
>
2002-12-03_PERMIT FILE - M2002118
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 4:55:39 PM
Creation date
11/20/2007 9:29:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002118
IBM Index Class Name
Permit File
Doc Date
12/3/2002
Doc Name
Permit Application
From
DG Huskin Construction Company
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the Landowners may allow public access if it is deemed beneficial. Part 46 of MSHA will <br />• be followed on this site. <br />3.1.5 Reclamation Measures -Material handling <br />(1) Grading shall be carried on so as to create a final topography appropriate to the final <br />land use selected in the Reclamation Plan. <br />(Z) When backfilling of the excavated area wilt consist of overburden and/or any inert <br />materials which may be hauled in from off site. Additionally all backfill material will be <br />compacted in place to insure stability. No toxic or acid-forming materials will be on site nor <br />will any be delivered to this mine site. <br />(3) All grading shall be done in a manner to control erosion and siltation of affected lands. <br />Best Management practices of mining will be used to protect areas outside the affected <br />land from slides and other damage. No highwalls are planned at this open pit mine. <br />(4) All backfilling and grading will be completed as soon as feasible after the mining <br />process. The operator will establish reasonable timetables consistent with good mining <br />and reclamation procedures. Grading of backslopes will be as mining is occurring, and the <br />pit floor will be contoured for seeding as mining proceeds. <br />• Topsoiling will be accomplished after mining has moved away far enough to make it <br />practical for seedbed prep and seeding. Also, time of year and weather conditions will play <br />a role in this timing. <br />(5) No refuse will be generated by this mining operation for cleaning and preparation of <br />substances mined. No acid-forming or toxio-producing materials will be mined or used for <br />processing at this sand and gravel mining -processing plant. Therefore, no plans have <br />been developed for their handling. <br />(6) There will not be any drill or auger holes unfilled after mining. All exploration will most <br />likely be done with small bore coring by a trained crew or by backhoe in selected areas, <br />and after discovery, all holes shall be backfilled as soon as possible. No adits or shafts will <br />be employed in this open pit. <br />(7) Maximum slopes and slope combinations shall be compatible with the configuration of <br />the surrounding conditions and selected land use. Where the pit does not daylight, <br />backsloping during mining will be completed at a slope of 3H:1V or flatter. No lakes or <br />ponds are designed for the final reclamation, which is rangeland. Therefore, no swimming <br />areas are proposed. <br />l~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.