Laserfiche WebLink
Description: Trapper Mine: East Flume As-Built <br />Comments: Effective Stress Analysis, along cross section B_B <br />Last Saved Date: 11/3/00 <br />Analysis Method: Bishop (with Ordinary & Janbu) <br />Direction of Slip Movement: Left to Right <br />Slip Surtace Option: Grid and Radius <br />P.W.P. Option: Piezometric Lines / Ru <br />Tension Crack Option: (none) <br />Seismic Coefficient: (none) <br />Description: Dam Material (SC) <br />10 20 30 40 50 60 70 80 90 100 110 120 0 140 150 160 170 180 190 200 210 220 230 240 260 270 <br />H~ontal (ft) <br />