My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO28488
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO28488
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:47:40 PM
Creation date
11/20/2007 9:28:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Hydrology
Doc Date
9/15/2004
Doc Name
Amendment No. 1 to CDPS Permit No. CO-0027146
Permit Index Doc Type
NPDES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART II <br />Page No. 27 <br />Permit Na.: CO-0027I46 <br />v) The permittee has received a variance. <br />vi) When required to incorporate applicable toxic effluent limitation or standazds adopted pursuant to § 307(a) of the <br />Federal act. <br />vii) When required by the reopener conditions in the pemut. <br />viii)As necessary under 40 C.F.R. 403.8(e), to include a compliance schedule for the development of a pretreatment <br />program <br />ix) When the level of dischazge of any pollutant which is not limited in the permit exceeds the level which can be <br />achieved by the technology-based treatment requirements appropriate to the permittee under Section 61.8(2) of dre <br />Colorado Discharge Permit System Regulations. <br />x) To establish a pollutant notification level required in Section 61.8(5) of the Colorado Dischazge Permit System <br />Regulations. <br />xi) To correct technical mistakes, such as errors in calculation, or mistaken interpretations of law made in determining <br />pemrit conditions, to the extent allowed in Section 61.10 of the Colorado State Discharge Pemdt System <br />Regulations. <br />xii) When required by a permit condition to incorporate a land application plan for beneficial reuse of sewage sludge, to <br />revise an existing land application plan, or to add a land application plan. <br />xiii) For any other cause provided in Section 61.10 of the Colorado Discharge Permit System Regulations. <br />c. At the request of a permittee, the Division may modify or terminate a pemut and issue a new pemrit if the following <br />conditions are met: <br />i) The Regional Administrator has been notified of the proposed modification or termination and does not object in <br />writing within thirty (30) days of receipt of notification, <br />ii) The Division fmds that the permittee has shown reasonable grounds consistent with the Federal and State statutes <br />and regulations for such modifications or termination; <br />iii) Requirements of Section 61.15 of the Colorado Dischazge Pemtit System Regulations have been met, and <br />iv) Requirements of public notice have been met. <br />d. Permit modification (except for minor modifications), termination or revocation and reissuance actions shall be subject to <br />the requirements of Sections 61.5(2), 61.5(3), 61.6, 61.7 and 61.15 of the Colorado Discharge Pernut System <br />Regulations. The Division shall act on a permit modification request, other than minor modification requests, within 180 <br />days of receipt thereof. Except for minor modifications, the temu of the existing permit govern and are enforceable until <br />the newly issued permit is formally modified or revoked and reissued following public notice. <br />e. Upon consent by the perndttee, the Division may make minor pernit modifications without following the requirements of <br />Sections 61.5(2), 61.5(3), 61.7, and 61.15 of the Colorado Discharge Permit System Regulations. Minor modifications to <br />pernits are limited to: <br />i) Correcting typographical errors; of <br />ii) Increasing the frequency of monitoring or reporting by the pernittee; or <br />iii) Changing an interim date in a schedule of compliance, provided the new date of compliance is not more than 120 <br />days after the date specific in the existing permit and does not interfere with attainment of the final compliance date <br />requirement; or <br />J iv) Allowing for a transfer in ownership or operational control of a facility where the Division deterranes that no other <br />change in the permit is necessary, provided that a written agreement containing a specific date for transfer of permit <br />responsibility, coverage and liability between the current and new pemrittees has been submitted to the Division; or <br />INDper$P.doc <br />Revised 09/li/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.