Laserfiche WebLink
f~ <br />' <br /> <br /> <br />' <br /> <br />' <br /> <br />-, EXHIBIT D (Cont'd) <br />purchased from the City of Rocky Ford. Road dust created <br />by mining and reclamation operations is controlled with <br />water purchased from the City of Rocky Ford and applied <br />from a water truck. <br />Mining Timetable. Demand rates in this pit area are <br />highly variable. The operator's best estimate is that <br />mining will be completed in 2059. <br />Estimated Estimated Estimated Average <br />Stage Timetable Total Acres ± Annual Tonnage t <br />' 0 1974-1976 12.23 125,000 <br /> I 1976-1981 17.56 65,000* <br /> II 1982-1986 7.22 251,333 <br /> III 1987-1991 5.82 251,088 <br /> IV 1992-1996 5.57 248,964 <br /> V 1997-2001 4.88 251,898 <br /> VI 2002-2006 4.03 249,320 <br /> VII 2007-2011 3.90 251,860 <br /> VIII 2012-2016 4.14 252,810 <br /> IX 2017-2021 4,39 250,128 <br /> 2022 <br />2026 6 <br />20 250 <br />584 <br /> X - , , <br /> XI 2027-2031 11.69 248,628 <br /> XII 2032•-2036 11.34 250,848 <br />' XIII 2037-2041 8,53 249,836 <br /> XIV 2042-2046 6.74 250,664 <br />' XV 2047 <br />2051 6 <br />89 248 <br />790 <br /> - , , <br /> XVI 2052-2056 9,01 250,692 <br /> XVII 2057-2059 5.77 176,832 <br />' <br /> TOTAL ACRES ± 135,91 <br />' *1976 through August 1977 <br />7 <br /> <br />