My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO28482
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO28482
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:47:40 PM
Creation date
11/20/2007 9:27:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999002
IBM Index Class Name
Hydrology
Doc Date
2/9/2000
Doc Name
FINAL AREA PERMIT VIC ISSUED TO AM SODA P 1-82
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />5) Flow rates should be measured with a calibrated turbine flowmeter. <br />6) Record injection rates using a chart recorder or a strip chart. <br />7) Measure pressures with a down hole pressure bomb. <br />8) Measure and record injection pressures with a gauge or recorder (for immediate test <br />results). <br />9) A plot of injection rates and the corresponding stabilized pressure values should be <br />graphically represented as a constant slope straight line to a point at which the formation <br />fracture, or "breakdown", pressure is exceeded. The slope of this subsequent straight line <br />should be less than that of the before-fracture straight line. <br />10) If the formation fracture pressure has definitely been exceeded, evidenced by at least two <br />injection rate-pressure combinations greater than the breakdown pressure, the injection <br />pump should be stopped, the line valve closed, and the pressure is allowed to bleed-off into <br />the injection formation. There will occur a significant instantaneous pressure drop <br />(Instantaneous Shut-in Pressure or ISIP), after which the pressure values begin to level out. <br />This ISIP value must be read and recorded. The ISIP obtained in this manner may be <br />considered to be the minimum pressure required to hold open a fracture in this formation at <br />this well. <br />11) Once the ISIP is obtained, the SRT is concluded. <br />12) In the event that the breakdown pressure was not obtained at the maximum test injection <br />pressure utilized, the test results may indicate that the formation is accepting fluids without <br />fracturing. <br />H:\UIC\RBUIC-Guidance\INFG-SYepRateTest.wpd January 12, 7999 <br />PriMOd on Raeydsd Popr <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.