Laserfiche WebLink
z <br />Part II MI may be demonstrated either before or after <br />issuing the Final Permit. However, if Part II is to be \ <br />demonstrated after the Final Permit is issued, a provision in the <br />permit will require the demonstration of Part II MI. The well <br />will also be required to pass Part II MI prior to granting <br />authorization to inject. <br />Radioactive tracer surveys and temperature surveys require <br />that the well be allowed to inject fluids as part of the <br />procedure. In these cases, a well that has shown no other <br />demonstration of Part II MI will be allowed to inject only that <br />volume of fluid that is necessary to conduct the appropriate <br />test. <br />After the results of the test proves that the well has . <br />passed Part II MI, the well will be given authorization to begin <br />full injection operations. <br />If any of the tests show a lack of Part II MI, the well will <br />be repaired and retested, or plugged (See Headquarters Guidance <br />x`76) . <br />• <br /> <br />• <br />