My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO28482
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO28482
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:47:40 PM
Creation date
11/20/2007 9:27:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999002
IBM Index Class Name
Hydrology
Doc Date
2/9/2000
Doc Name
FINAL AREA PERMIT VIC ISSUED TO AM SODA P 1-82
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C'~ <br />5 <br />PART IV - CONCLUSIONS - <br />• <br />Different pipe weights and cement types will affect the log <br />readings, so be mindful of these factors in wells with <br />varying pipe weights and staged cement or squeeze jobs. <br />Collars generally do not show up on the VDL track in well- <br />bonded sections of casing. <br />Longer (slower) travel time due to cycle skipping or cycle <br />stretch usually suggests good bonding. <br />Shorter (faster) travel times indicate a de-centered tool or <br />a fast formation and will provide erroneous amplitude <br />readings that make evaluation impossible through that <br />section of the log. Fast formations do not assure that the <br />cement contacts the formation all around the borehole. <br />Although the bond index is important, you should not base <br />your assessment of the cement quality on that one factor <br />alone. You should use the VDL to support any indication of <br />bonding. Also, you must know how each portion of the CBL <br />(VDL, travel time, amplitude, efc.) influences another. <br />Most 3'-5' CBL's cannot identify a 1/2" channel in cement. <br />Therefore, you also need to consider the thickness of a <br />cemented section needed to provide zone isolation. For <br />adequate isolation in injection wells, the log should <br />indicate a continuous 80$ or greater bond through the <br />following intervals as seen in TABLE 1, below: <br />TABLE 1 -INTERVALS FOR ADEQUATE BOND <br />PIPE DIAMETER (in) CONTINUOUS INTERVAL WITH BOND Z 80$ (ft) <br />4-1/2 15 <br />5 15 <br />5-1/2 18 <br />7 .. 33 . <br />7-5/8 36 <br />9-5/8 45 <br />10-3/4 54 <br />Adequately bonded cement by itself will not prevent fluid <br />movement. If the bond log shows adequate bond through an <br />interval where the geology allows fluid to move (permeable <br />and/or fractured zones), fluids may move around perfectly <br />bonded cement by travelling through the formation. Alwava <br />cross-check your bond log with open hole cogs to nee that <br />you have adequate bonding through the proper interval(s). <br />
The URL can be used to link to this page
Your browser does not support the video tag.