Laserfiche WebLink
• <br />TABLE 4-2. RAW WATER LEVEL DATA (Continued) <br />llepth-MI'* Elevation Water <br />Date Time Well MP* Feet lb/inZ MP* Elevation Notes <br />3-U9-79 -- G"L-3 Top YVC -46.0 -- 7016.22 6970.2 -- <br />3-29-79 13:30 C86-1 Gauge 2.3 l.U 6131.1 6133.4 Very slight <br />3-29-79 13:40 CRB-2 Tup YVC -50.8 -- 6]30.2 6079.4 flow, CISB-1; <br />3-29-7U 13:50 GBB-3 Top f'VC - 3.8 -- 6131.1 6127.3 2-3" water on <br /> surface; mud <br /> pits have <br /> water; temp. <br /> warm <br />3-3U-79 -- GZ-1 Top PVC -- -- -- -- Muddy (38U- <br /> 39U'?) <br />3-3U-79 -- CZ-2 Top PVC -191.0 -- 7013.14 6822.1 -- <br />3-30-79 -- GZ-3 Top PVC -49.9 -- 7016.22 6966.3 -- <br />F 3-30-79 -- CF-1 Cauge +34.6 15.0 6468.12 6502.7 Slight leak <br />~y 3-3U-79 -- GP-2 Cauge + 4.6 2.U 6466.00 6470.6 Slight flow; <br /> • had PVC leak <br />3-30-79 -- GP-3 Gauge +23.1 lU.U 6464.94 6488.0 Slight flow <br />6-U4-79 12:45 CBB-1 Tup PVC U -- 6130.37 ? Wellhead re- <br /> moved; PVC <br /> cut <br />6-U4-79 13:00 CNB-2 Tup PVC -41.95 -- 6130.2 6088.3 -- <br />6-04-79 13:20 GBB-3 Top PVC - 5.44 -- 6131.1 6125.7 -- <br />*MP - mea suring point for water level s. <br />