Laserfiche WebLink
26 <br />c. Low head transfer pumps (1 or 2) <br />d. Control sump with level control <br />e. Return water pump <br />f. Two polymer tanks with agitators <br />g. Polymer Pump (PD) <br />h. Infeed conveyor <br />i. Blower <br />j. Hydraulic power pack <br />k. Feeder <br />1. Pipelines <br />m. Stowing deflector. <br />Initial Mine Visit <br />During the initial visit to WSCHNM, FMA and Radmark personnel <br />accomplished the followings <br />a. Inspected the proposed area to be backfilled <br />b. Inspected the operating, in-mine fine refuse slurry <br />pipeline <br />c. Inspected the wash plant <br />d. Obtained current mine layouts <br />e. Obtained pertinent detailed wash plant drawings <br />f. Measured various wash plant process parameters <br />g. Met with ~~arious members of iaSC, Office of Surface <br />Mi:iing and USBM to discuss the proposed backfill <br />program. <br /> <br /> <br />u <br />1 <br />t <br />~' <br />