Laserfiche WebLink
<br />Table 1. Mahhours by Task <br />0 <br />Task Description PM PE SE Tech A/S Radmark MSC <br />3. Program Plan <br />3.1 Nine Waste Transport System Concept <br /> Design and Revised Program Plan 00 RO -- -- lU GO 140 <br />3.2 Physical and Chemical Characteristics <br /> of Coal Waste 20 80 -- 160• -- -- 20 <br />3.3 Detail Design <br />3.3.1 Waste Preparation and Injection into <br /> Ilydraulic Lines 5 40 -- -- -- -- 10 <br />3.3.2 pipeline 5 40 -- -- -- -- -- <br />3.3.3 Dewatering 5 40 -- 160• -- -- 20 <br />3.3.4 Pneumatic Feeder 5 -- -- -- -- 120 -- <br />3.3.5 System Control 5 30 -- -- -- 30 -- <br />3.3,6 Material Flow Monitoring 5 20 -- -- -- -- -- <br />3.4 EfFecta of System Design on Mine <br /> Operation -- -- 30 -- -- 40 60 <br />3.5 Monitoring of waste Material Effects <br /> on Mine Conditions -- -- 30 -- -- -- 60 <br />3.6 Permits for Implementing Underground <br /> Disposal System 10 10 5 -- -- 5 50 <br />3.7 Phase I Report 40 40 20 -- 60 40 40 <br />3.8 Reporting 10 -- -- -- 10 -- -- <br /> Totals 190 380 85 320• 80 295 400 <br />Priced in Option 1 <br />LEGEND: PM = program Manager SE = Senior Engineer A/S = Administrative Support WSC = Western <br />PE = Project Engineer Tech = Technician Radmark Radmark Engineering Slope Carbon <br />• - - <br />_ . ~ ~~ <br />