Laserfiche WebLink
C~ <br />DRAWING INDEX <br />~J <br />~~ <br />2.03.4(5)-1 Surface Owners <br />2.03.4(5)-2 Mineral Rights <br />2.04.3(2)(b)(i)-1 81/2 x 14 U.S.G.S. Quad (mine and Cedaredge) <br />2.04.5-1 Locations of Ditch Diversions from <br /> Ward Creek & Williams Creek <br />2.04.6(2)(a)(i)-1 Drill Hole Data and Cross-Section <br /> Federal Lease #D-036906 <br />2.04.6(2)(a)(i)-2 Coal Reserve Base Map <br />2.04.8(1)-1 Map of Colorado Showing Weather Monitoring Stations <br />2.05.3(1)-lA Typical Extraction Method <br />2.05.3(1)-1 Face to Truck Coal Handling Sequence <br />2.05.3(2)(b)-1 Cross Sections oP Proposed Portal Site <br />2.05.3(2)(b)-2 Cross Sections of Pooposed Portal Site <br />2.05.3(3)(b)Ivi)(A)-1 Proposed Sound Block Wa11 <br />2.05.3(3)(b)(vi)(C--1 Easement, DMBA 46KV Powerline <br />2.05.3(3)(c)(i)-1 Mine Road - Cross Sections and PmPile <br />2.05.3(3)(c)(i)-2 Office road - Cross Sections and Profile <br />2.05.3(3)(c)(i)-3 Service Area Road - Cross Sections Profile <br />2.05.3(3)(c)(i)-4 Powder Magazine Road - Cross Sections and Profile <br />2.05.3(3)(c)(i)-5 Underground Development Waste Disposal Area <br /> Road - Cross Sections and Profile <br />2.05.3(3)(c)(i)-6 Proposed Portal and Yard Area to the Red Canyon <br /> No. 2 Mine -Cross Section and Profile <br />2.05.3(4)(b)-1 Cross Sections of Proposed Sed. Pond Deleted 6-16-88 <br />2.05.3(4)(b)-2 Cross Sections of Proposed Sed. ford Deleted 6-16-88 <br />2.05.3(4)(b)-3 Specification of Weir Deleted 6-16-88 <br />2.05.3(4)(b)-4 Revised Pord Cross Section Deleted 6-16-88 <br />2.05.3(4)(b)-5 Cross Section of Emergency Spillway Deleted 6-16-88 <br />2.05.3(7)-1 Deleted 2-26-88 <br />2.05.3(7)-2 Coal Handling Process from Face to Rail Cars <br />2.05.3(9)-1 Schematic Representation of Stages of Proposed <br /> Underground Developmen Waste Site <br />2.05.3(9)-2 Cross Sections of Proposed Under-ground <br /> Development Waste Site <br />2.05.4(2)(C)-1 Major Drainage Longitudinal Cross Section <br />2.05.4(2)(C)-2 Major Drainage Latitudinal Cross Section <br />2.05.4(2)(C)-3 Typical Major Drainage Final Contour <br />2.05.6(6)(f)(ii)(A)-1 Schematic of Area of Influence Por Structures <br />2.05.6(6)(f)(ii)(A)-2 Schematic of Area of Influence for Structures <br />2.05.6(6)(P)(ii)(A)-3 Schematic of Area of Influence Por Structures <br />2.06.8(3)(b)(ii)-1 Streams and Related Reservoirs <br />Revised June 16, 1988 <br />