Laserfiche WebLink
FIGURE INDEY (cont'd) <br />• NUMBER NAME <br /> 2.04.7(2)(b)-1 Sample #1-Water Analysis-9/20/79 <br /> 2.04.7(2)(b)-2 Sample #2-Water Analysis-9/21/79 <br /> 2.04.7(2)(b)-3 Sample #3-Water Analysis-9/21/79 <br /> 2.04.7(2)(b)-4 Sample #4-Water Analysis-9/20/79 <br /> 2.04.7(2)Ib)-5 Sample #5-Water Analysis-9/20/79 <br /> 2.04.7(2)(b)-6 Ditch Water Samples Analysis-12/16/80 <br /> 2.04.7(2)(b)-6a Water Analysis of Sample Sites A, B, C, and D <br /> present Monitoring, 7/29/81 <br /> 2.04.7(2)(b)-7 NPDES Permit <br /> 2.04.7(2)(bl-8 NPDES Permit Deleted 12/22/88 <br /> 2.04.7(2)(b)-9 NPDES Permit Deleted 12/22/88 <br /> 2.04.9(1)(a)-1 Letter from U.S. Department of Agriculture <br /> 2.04.9(1)Id)-1 CSU Soil Evaluation Letter <br /> 2.04.11(1)-1 Impact of Mining on Wildlife <br /> 2.04.11(1)-2 Consultation with Division of Wildlife <br /> 2.05.3(3)(b)(vi)(A)-1 Fan Noise Correspondence, 6/23/81 <br /> 2.05.3(3)(b)(vi)(C)-ls-c DMEA Letter on Trsu~,4m;ssion Line <br /> 2.05.3(3)(bl(vi)(c)-2a-b Westhill Consultants Letter on Distribution Line <br /> 2.05.3(4)(a)-1 Sediment Control System Approved in Permit #77-232 <br /> .05.3(4)(al(ii)-1 Proposed Sedimentation Pond Capacity Deleted 6/16/88 <br /> .05.3(4)(b)-1 Proposed Sedimentation Pond Calculations <br /> Deleted 6/16/88 <br />• <br />~ 2.05.3(4)(b)-2 <br />2 <br />05 <br />3(4)(b)-3 Pond Size Verification Deleted 6/16/88 <br />Principal Spillway Calculations Deleted 6/16/88 <br />~ <br />C,(OQO <br />~ . <br />. <br />2.05.3(4)(b)-4 Proposed Sedimentation Pond Dewatering Device <br />o~ Calculation Deleted 6/16/88 <br />Q ~j 2.05.3(4)(b)-5 Proposed Sedimentation Pond Emergency Spillway <br />l,~o~ Calculation Deleted 6/16/88 <br /> 2.05.3(4)(b)-6 Explanation of Calculations Deleted 6/16/88 <br /> 2.05.3(4)(d)-1 Culvert C Specifications Deleted 6/16/88 <br /> .05.3(6)lc)-1 Location of Test Holes by Fox Consulting Engineers <br /> 2.05.3(6)lc)-2 Logs on Test Holes by Fox Consulting Engineers <br /> 2.05.3(6)(c)-3 Logs on Test Holes by Fox Consulting Engineers <br /> 2.05.3(6)(c)-4 Logs on Test Holes by Fox Consulting Engineers <br /> 2.05.3(6)(c)-5 Logs on Test Holes by Fox Consulting Engineers <br /> 2.05.3(7)-1 Pond Approval Letter, Delta Site Deleted 6/16/88 <br /> 2.05.4(2)(e)(vi)-1 Sampling Adequacy Test <br /> 2.05.6(1)(a)-1 Final Approval Emission Permit <br /> 2.05.6(1)(a)-2 Initial Approval Emission Permit <br /> 2.05.6(6)(f)lii)(A)-1 Pillar Stability Calculations-Overt/Duvall <br /> 2.05.6(6)(f)(ii)lA)-2 Pillar Stability Analysis of Superimposed Seems <br /> 2.05.6(6)(f)lii)(A)-3 Pillar Stability Calculations-Wilson <br /> 2.07.6(2)(d)(iv)(A) Approval Letter from Delta County'Commissioners <br /> 4.07.3-1 Drill Hole Information, New 5/17/91 <br /> 4.07.3-2 Drill Hole Information, New 5/17/91 <br /> 4.07.3-3 Drill Hole Information, New 5/17/91 <br /> 4.07.3-4 Drill Hole Information, New 5/17/91 <br />• <br /> Revised May 17,1991 <br />