Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.9(17) <br />Mine: New Elk Rj7N- S4J i~..,~arwwrPU'f <br />NPDES ID. No.: None <br />Inspection Period: Second Quarter 2006 <br />Inspection Date: 06/12/06 <br />General Descri~ on oar Reference to Site Plan: ~S~/~ K S~y,u ~ `~' .~ <br />~is /S a 0.v c (NUSC'< ~)mSln~/.S ~ ~~ve or SWf ~ WJ <br />(/sue ~ lz c~YAt/ra fu•~-~ ~f~ Rte- ~ (y <br />EMBANKMENT <br />1). Adequacy of the vegetative cover. Excellent Moderate ~ Poor <br />2). Erosion forming Gullies: Extensive Some ~ None <br />3). Is wave action qusing erosion: <br />On the Upstream embankment? Yes No C_ <br />4). Erosion of the downstream tce of the embankment? Yes No <br />Cause of erosion qn be attributed to: <br />5). Is seepage occurring through the dam? Yes No ~~ <br />Could this seepage cause potential instability? <br />SEDIMENT STORAGE CAPACITY <br />1). Has the design storage capacity of the reservoir been surpassed? <br />Yes No C._- <br />Explain: <br />OTHER OBSERVATIONS: ~~_ ~~ o,Q,`, ~e ~ <br />f yl 5 <br />M HA Qualfied Impoundment I spector <br />,G /c~/off/off' <br />Date <br />