Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.9(17) <br />Mine: New EIk <br />NPDES ID. No.: Pond #8 <br />Inspection Period: Second Quarter 2006 <br />Inspection Date: 06/12/06 <br />General Description or Reference t Site Plan' r z <br />/~?~s ~°Qn (BS °d~ `/ ff~~~ecerv~S J~ccH-0~ t-r~o-N.~~ <br />~ ~~~ oCrS fJ <br />Re~~ ~rsPas~ ~« <br />EMBANKMENT <br />1). Adequacy of the vegetative cover. Excelle Moderate Few Poor <br />2). Erosion forming Gullies: Extensive Some ~ None <br />3). Is wave action causing erosion: <br />On the Upstream embankment? Yes No ~- <br />At the principal spillway inlet? Yes No <br />4). Erosion of the'downstream tce of the embankment? Yes No <br />Cause of erosion can be attributed to: <br />5). Is seepage ocxxrrting through the dam? Yes No /_ <br />Could this seepage cause potential instability? <br />PRINCIPAL SPILLWAY <br />1). Is the principal spillway system in working order? Yes ~ No <br />2). Is the inlet free of debris and restrictive material? ~ Yes ~- No <br />3). Is the discharge outtet free of restrictive material? Yes ~ No <br />4). is eroson occuning at the discharge outlet? Yes No `- <br /> Evaluate the severity: Extensive Moderate Just starting None <br />