Laserfiche WebLink
r <br />Home Office Well Monitoring Program Interim Report <br />2.0 Summary of Current Results <br />2.1 Measurement and Data Handling <br />Thirteen months of data have been collected, from November 2001 to December 2002. All well <br />locations have been surveyed as to elevation and horizontal location. Monitoring well permits <br />have been submitted to the State Engineer's Office for approval. Field data logs have been <br />developed for each well and standard procedures have been developed for consistent <br />measurements. <br />2.2 Data Analysis and Interpretation <br />The monitoring program is currently in the baseline data collection phase. There is no analysis <br />to be performed until mining activities begin. The raw data is shown in the graphs presented <br />with this evaluation. The data is included with the graphs in the appendix of this report. The <br />outliers, or high and low data points, will be removed from the sample population and the <br />adjustments of the raw data based on the river flow and seasonality will be performed, as <br />described in the Well Monitoring Protocol, once all of the baseline data has been collected. <br />Removing these outlying data points will create a more constrained tolerance limit. The <br />tolerance limits will also be identified once all of the background data has been obtained. <br />3.0 Graphical Representation of Data <br />3.1 Explanation of Graphs <br />For each well, a time series graph of each constituent is included in the following section. <br />TST~ INC. CONSV ITING ENGINEERS <br />Page 4 <br />