Laserfiche WebLink
iiiiiiiiiiiuiuiii , <br />STATE, OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmem of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phune: (3031 866-3567 <br />FA\:1303)832-8105 <br />August 29, 2000 <br />DIVISION OF <br />MINERALS <br />GEOLOGY <br />RECLAMATION <br />MINING•SAFETY <br />Mr. Llyod Barnhart B~II O.vem <br />Barnhart Agency, Inc. Governor <br />Greg E. W~ICher <br />212 W. 13[11 St. E~ecunve Dveaor <br />Pueblo, CO 81003 h,~enael e. Long <br />Division Dbeelor <br />Re: North Farm Road Gravel Pit, File No. M-2000.110, Receipt of 112 Construction Materials <br />Reclamation Permit Application Package <br />Dear Mr. Barnhart: <br />On August 29, 2000, the Division of Minerals and Geology received your 1 l2 Construction Materials Reclamation <br />Permit Application package for the North Farm Road Gravel Pit, File No. M-2000-110,. Preliminary review of the <br />information received determined that the following items must be received before the Division can consider your <br />application as being submitted and technical review can begin: <br />EXHIBIT G -Water Information (Rule ti.4.71: (1) If the operation is not expected to directly affect <br />surface or groundwater systems, a statement of that expectation shall be submitted. <br />(2) If the operation is expected to directly affect surface or groundwater systems, you shall: <br />(a) Locate on the map (in Exhibit C) tributary water courses, wells, springs, stock water <br />ponds, reservoirs, and ditches on the affected land and on adjacent lands where such structures may be <br />affected by the proposed mining operations; <br />(b) Identify all known aquifers; and <br />(c) Submit a brief statement or plan showing how water from dewatering operations or from <br />runoff from disturbed areas, piled material and operating surfaces will be managed to protect against <br />pollution of either surface or groundwater (and, where applicable, control pollution in a manner that is <br />consistent with water quality discharge permits), both during and after the operation. <br />(3) You must provide an estimate of the project water requirements including flow rates and annual <br />volumes for the development, mining and reclamation phases ofthe project. <br />(4) You must indicate the projected amount from each of the sources of water to supply the project <br />water requirements for the mining operation and reclamation. <br />(5) You must affirmatively state that the Operator/Applicant has acquired (or has applied for) a <br />National Pollutant Discharge Elimination System (NPDES) permit from the Water Qualiry Control Division <br />at the Colorado Department of Health, if necessary. <br />EXHIBIT H -Wildlife Information (Rule 6.4.81: (I) In developing the wildlife information, you may <br />