My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO28422
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO28422
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:47:38 PM
Creation date
11/20/2007 9:23:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Hydrology
Doc Date
1/30/1998
Doc Name
4th Qtr 1997 Inspections
From
SENECA COAL CO
To
DMG
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERIODIC INSPECTION FORM <br />Stockpoads or Sumps <br />INSPECTOR'S NAME: Roy Raro <br />FACILITY CONFIGURATION: stoc,pond <br />SITE NAME: T-13 <br />MINE NAME: s n -a rr <br />MINE I.D. NO.: C-BO-DOS <br />DATE: 12/~fq7 <br />DATE LAST INSPECTION: 09/24/97 <br />LOCATION: NW'~~id C~pr ~, TSN. R87W <br />LOCATION: 7.1 m; sF. of Hayden, CO <br />OWNER'S REP.: Brad Hrowp} Gen Mq~_ <br />1. Angle of elope: 3:i upstream, 3:7 downstream <br />2. *Seepage (specify location, color, and approximate volume) <br />At isolated points on e[)tbankment slopes: <br />At natural hillside: <br />Over widespread areas: <br />From downstream foundation area: <br />"Boils" beneath stream or ponded water: <br />3. Cracks or scarps on crest: <br />4. Cracks or scarps on slope: <br />5 <br />6 <br />7 <br />Sloughing or bulging on elope: <br />*Major erosion problems: <br />Surface movements in valley bottom or on hillside: <br />8. *Erosion of toe: <br />9. *Water impounded against downstream toe: <br />10. Existing embankment freeboard: Annroximately <br />11. Increase Decrease in water Level: No change <br />12. Cracks, bulging, or erosion on upstream face: <br />13. Spillway erosion: <br />14. *Clogging <br />Spillway channels: <br />Diversion ditches: <br />Yes ~ N/A <br />Yes ~ N/A <br />Yee No N/A <br />Yes ©° N/A <br />Yee ~ N/A <br />Yes ~~ N/A <br />Yee ~ <br />o N/A <br />Yes ~ N/A <br />Yes ~ N/A <br />Yes I~o N/A <br />Yes ~ N/A <br />Yee ~ N/A <br />~_ feet <br />feet <br />Yes o N/A <br />Yes No N/A <br />Yee o N/A <br />Yee o N/A <br />*Major adverse changes in these items could cause instability and should be reported to <br />the Engineering Manager and Mine Superintendent for further evaluation. Adverse <br />conditions noted in these items should normally be described (extent, location, volume, <br />Total = 6.1 N/A <br />etc.) in the apace on the back of this sheet. <br />
The URL can be used to link to this page
Your browser does not support the video tag.