Laserfiche WebLink
Asa-6 <br /> Solution: Maximum Allowable Velocity, Vmax = 4.5 fps <br /> Minimum Allowable Velocity, Vmin = 2 fps <br /> q10 = 14.5 cfs (from Peak Discharge Calculations) <br /> n = 0.03 (Manning coeffi cient for riprap) <br /> sideslope = 2:1 (horizontal to vertical) <br /> slope(s) = 0.01 feet/feet <br /> Manning Equation: <br /> q10 = 1n49 AR '/, S '/,, <br /> <br /> Hydraulic Data: <br /> Q = 14.5 cfs <br /> D = 1.41 feet <br /> A = 3.98 feet i <br /> R = 0.47 feet <br /> s = 0.01 feet/feet <br />• n = 0.03 <br /> V = 3.65 _ fps <br />III. SEDIMENTATION RESERVOIR COLLECTOR DITCH DESIGN - North of CFA Access Road <br />Problem: Determine hydraulic data of a V -shaped collector <br />ditch, depth of flow at the design storm and maximum anticipated <br />velocity. <br />Solution: <br />Maximum Allowable Velocity, Vmax = 4.5 fps <br />Minimum Allowable Velocity, Vmin = 2 fps <br />q10 9'S cfs (from Peak Discharge Calculations <br />n = 0.03 (Manning coefficient for riprap) <br />sideslope = 2:1 {horizontal to vertical) <br />slope(s) = 0.02 feet/feet <br />Manning Equation: <br />q10 = 1_49 Ar '/a S '/,, <br />n <br />r <br />,i.~ ~t 2 Z 198 <br />