A - 2 <br />sg <br />REFUSE DISPOSAL AREA - DITCH SIZING CALCULATIONS <br />• I. BACKGROUND INFORMATION AND ASSUMPTIONS <br />ALL DITCHES AND DIVERSIONS DIRECTLY EFFECTED BY THE REFUSE PILE <br />MUST BE DESIGNED TO SAFELY PASS THE FLOW OF A 100 YEAR - 24 HOUR <br />STORM. <br />The refuse disposal area is designed so that the bulk of the <br />Flow in all Four stages of construction will be directed towards <br />the north collector ditch. In the early phases of the project. <br />the north ditch will convey the drainage around the pile to an <br />existing stream channel that will direct the water to the <br />sediment pond. <br />Since phase IV of the refuse pile is the largest, the drainage <br />channels will be designed and constructed to safely convey the <br />quantities of water from the 100 year storm for that design. <br />The total area drained by the ditches in Phase 4 of the project <br />is 30 acres but only about 4 acres will be drained by the south <br />ditch. To ensure that adequate capacity exists for the north <br />ditch, it will be designed to handle runoff from the entire 30 <br />acres. The south ditch will be designed to handle the runoff <br />from the 4 acres that can drain into it. <br />• 11. PEAK FLOW CALCULATIONS <br />A. SOUTH COLLECTOR DITCH <br />1. From Figure S-7 in "Peak Flows in Colorado" P100 = 2.4" <br />2. For Natural Areas CN = 80 Refuse Pile CN = 85 <br />3. Schematic summarizes the Flow into the channel. <br />Area l Area 2 Area 3 <br />(1.00 ac) (0.54 ac) (0.37 ac) <br />Segment 1 Segment 2 <br />------------------------------------------------Sediment Pond <br />length = 1750' length = 320' <br />Slope = 7.14% Slope = 15.49. <br />Undisturbed Undisturbed <br />Area 4 Area 5 <br />(0.97 ac) (1.42 ac) <br />4. Area 1 = 1.00 ac Slope = 50% Slope adjustment factor = 1.17 <br />Hyd. length = 520' Equivalent Area = 4.57 ac CN = 85 <br />Runoff = 1.10" Peak Discharge = 4.8 CFS/inch of runoff <br />Equivalent Discharge = 1.10 X 4.8 X 1.17 = 6.18 CFS <br />Actual Discharge = 6.18 X 1.00 / 4.57 = 1.35 CFS <br />. Q100 = 1.35 cfs <br />2/16/89 <br />