Laserfiche WebLink
Asd-5 <br />II. SEDIMENTATION RESERVOIR EMERGENCY SPILLWAY DESIGN <br />• Problem: Determine hydraulic data of a V -shaped outlet <br />ditch, depth of flow at the design storm, and high <br />waterline elevation of the reservoir. <br />Solution: Maximum allowable velocity, Vmax - 3fps <br />q25 = 5.0 cfs (from Peak Discharge Calculations) <br />n = 0.03 (Manning coefficient for riprap) <br />sideslope = 2.1 (horizontal to vertical) <br />slope(s) = 0.01 feet/feet <br />Manning Equation: <br />q25 = 1.49 AR3s S%= <br />n <br />Hydraulic Data: <br />Q = 5 cfs <br />D = 0.95 feet <br />• A = 1.81 feet2 <br />R = 0.42 feet <br />s = 0.01 feet/feet <br />n = 0.03 <br />V = 2.77 fps <br />Assume reservoir high waterline to discharge the de- <br />sign storm is equal to the spillway invert elevation <br />plus the depth of flow in the outlet channel: <br />H.W.L. 25-year = 5226.10 + 0.95 = 5627.05' <br />To provide approximately one foot of freeboard, the <br />top of embankment shall be at an elevation of 5228.00. <br />III. SEDIMENTATION RESERVOIR COLLECTOR DITCH DESIGN - Topsoil Stockpile <br />Problem: Determine hydraulic data of a V-shaped collector <br />ditch, depth of flow at the design storm and max- <br />imum anticipated velocity. <br />• <br /> <br />