Laserfiche WebLink
PERIODIC INSPECTION FORM <br />3tockponde or Sumps <br />INSPECTOR'S NAME: Rov Karo <br />FACILITY CONFIGURATION: Stockoond <br />SITE NAME: T-25 <br />MINE NAME: Seneca II <br />MINE I.D. NO.: C-80-005 <br />DATE: 06/19/95 <br />DATE LAST INSPECTION: 03/31/95 <br />LOCATION: SES:SES:. Sec 2. TSN. R87W <br />LOCATION: 7.1 mi SE of Hayden. CO <br />OWNER'S REP.: Scott Williams. Gen Mar <br />Circle or write in aoorooriate reaoonae <br />1. Angle of slope: upstream, downstream Total = N/A <br />2. "Seepage (specify location, color, and approximate volume) <br /> At isolated points on embankment slopes: Yes ~ N/A <br /> At natural hillside: Yes , <br />tLVOI N/A <br /> Over widespread areas: Yes o N/A <br /> From downstream foundation area: Yes ® N/A <br /> "Roils" beneath stream or ponded water: Yes o N/A <br />3. Cracks or scarps on crest: Yes N N/A <br />4. Cracks or scarps on slope: Yes ~ N/A <br />5. Sloughing or bulging on slope: Yes ~ N/A <br />6. 'Major erosion problems: Yes ///~~~++ <br />~ N/A <br />7. Surface movements in valley bottom or on hillside: Yes o N/A <br />8. •Erosion of toe: Yes N/A <br />9. +Water impounded against downstream toe: Yes N/A <br />10. Existing embankment freeboard: Aooroximately 6 feet <br />11. Increase Decrease in water level: No chance feet <br />12. Cracks, bulging, or erosion on upstream face: Yes ~ N/A <br />13. Spillway erosion: Yes ~ N/A <br />14. "Clogging <br /> Spillway channels: Yes ~ N/A <br /> Diversion ditches: Yes CJf/) N/A <br />*Major adverse changes in these items could cause instability and should be reported to <br />the Engineering Manager and Mine Superintendent for further evaluation. Adverse <br />conditions noted in these items should normally be described (extent, location, volume, <br />etc.) in the space on the back of this sheet. <br />