Laserfiche WebLink
~/,w.n., United States • Forest Medicine RoN• Parks Ranger District <br />'-~ Department of Serrice Routt Natioal 100 Main Street <br />~ Forests PO Box 158 <br />Agriculture <br />~Yalden, CO 80480-0158 <br />h ttp://www.fs.fed. us/mrnf <br />File Code: 6320/7730 <br />Date: March 27, 2000 <br />Barbara D. Chiappone <br />State of Colorado Division <br />Division of Minerals and Geology <br />Department of Natural Resources <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Dear Barbara: <br />RECEIVED <br />MAR 2 g 2000 <br />Division of Minerals & GeOPogy <br />Thank you for contacting me regarding the 110 Construction Materials Reclamation Permit <br />Application package for the State Line Ranch pit, which I submitted to the Division on March <br />] 0, 2000. <br />The purpose of this letter is to address each item that you indicated must be received in order to <br />continue with the permit application review process: <br />Completing Item No. 3, Pernutted Acreage, on the application form: Done (see resubmitted <br />form). This was an omission on my part and I apologize for the oversight. <br />Exhibit D -Reclamation Plan: I did not submit a cost estimate for the Reclamation Plan <br />because the Medicine Bow-Rout[ National Forest will perform reclamation work using our own <br />resources and equipment. I discussed this item with our Forest Engineer, Marv Froistad, and <br />Marv felt that since we ate a Federal Government entity, and we are signing a Performance <br />Warranty, that should be adequate to ensure the reclamation work will be completed as indicated <br />in the warranty and plans. However, I have included a cost estimate with this letter which <br />indicates estimated costs for a private contractor to reclaim the pit in accordance with the <br />Reclamation Plan, in the very unlikely event that the Medicine Bow-Rout[ National Forest <br />would default on their reclamation responsibility. <br />Exhibit J -Proof of Mailing Notices of Permit Application: I have always associated the <br />North Park Soil Conservation District with the District Conservationist, AI White. I did not <br />realize that there was another Soil District entity in North Park and I apologize for this oversight. <br />I have sent a Notice to the Board of Supervisors as required (see attached Receipt of Mailing). <br />Exhibit L -Permanent Man-Made Structures: I have resubmitted Exhibit L to include the <br />State Highway 125 right-of-way fence. As noted in this exhibit and in the Mining Plan, all <br />development will occur away from the area of the fence and there is currently a I50' buffer <br />between the existing development and the fence that will remain undisturbed. <br />Caring for the Land and Serving People PnmeG on RecytleE Peper ~~I <br />