Laserfiche WebLink
<br />l~ <br /> <br />EXHIBIT B <br />tIINING PLAN <br /> <br />The gravel will be used as base material in the construction of county <br />roads. It is anticipated that approximately 20,000 tons will be used within <br />the year. The gravel will be removed to a depth of approximately 15 to <br />20 with a front end loader. The material will be hauled by dump truck <br />to the road construction site. There will be no stockpiling of top- <br />soil as the site is totally decomposed granite. If any suitable topsail <br />is encountered it will be removed and stockpiled. No other stockpiling <br />will occur unless the material is screened. If for some reason screen- <br />ing occurs the stockpile will be located within the existing pit area. <br />The proposed mining will proceed eastward from the existing pit area. <br />(See Exhibit C) <br />The largest amount of materials will be removed during the summer <br />months as this is when most road up-grading occurs. <br /> <br />