My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO28376
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO28376
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:47:35 PM
Creation date
11/20/2007 9:20:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
Hydrology
Doc Date
5/10/1993
Doc Name
REQUEST FOR STORMWATER EXEMPTION
From
KERR COAL CO
To
WQCD
Permit Index Doc Type
NPDES Permit
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_. ~' <br />Ms. Anne tl 'nfeldt <br />Date: <br />Page T o <br />All sedimentation ponds are designed to con[ain the full design runoff volume resulting from <br />a 10 year, 24 hour storm event. S[ormwater storage capacity is in addi[ion to design sediment <br />storage and any permanent storage capacity. Kerr inspects all sedimentation ponds on a <br />quanerly basis. Inspections include evaluation of accumulated sediment levels rela[ive to design <br />sediment storage capaary to verify that design stormwater storage capacity is maintained at all <br />times. If inspections indicate that sediment accumulations are at or near the design sediment <br />level, Kerr removes accumulated sediment from [he pond(s) within a reazonable period (rypically <br />30 to 60 days) following the inspection. Both pond inspection reports and documentation of <br />pond clean-out are retained at the minesite and are available for inspettion by authorized agency <br />representatives. Based on direct observation of pond storage levels at the time discharge <br />occurred, the discharge resulted from: <br />Rainfall or snowmelt runoff volumes less [han or equal to the design 10 year, 24 <br />hour storage volume <br />^ Rainfall or snowmelt runoff volumes greater than the design 10 year, 24 hour <br />storage volume <br />Bazed on the preceding information, Kerr respettfully reques[s that the Water Quality Control <br />Division approve a stormwarer exemption for exceedance of effluent limitations consistent with <br />exemption and azsocia[ed burden of proof provisions az outlined in Permit COG850021. It is <br />understood that this exemption applies only to [he specified monitoring period(s), the subject <br />outfall(s), and the following effluent parameters: <br />Tss ~3~3) <br />^ Settleable Solids <br />~( Other 1J- D/~ ,303 ~ 3~~~ <br />We appreciate your consideration of and cooperation in this matter. Please feel free to contact <br />me with any questions or if you require furcher documentation. <br />erely, <br />err Coal Company <br />c . ::;Tour . ~: •: <br />
The URL can be used to link to this page
Your browser does not support the video tag.