My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO28372
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO28372
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:47:35 PM
Creation date
11/20/2007 9:20:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Hydrology
Doc Date
4/19/2004
Doc Name
Exhibit 7 NPDES Permit
From
Colorado Health Department of Public Health & Environment
To
Mountain Coal Company
Permit Index Doc Type
NPDES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PARTI <br />Page No. 15 <br />Permit No.: CO-0038776 <br />f SWMP Availability (continued) <br />Alt SWMPs required under this pemut are considered reports that shall be available to the public under Section 308(6) of the <br />CWA. The owner or operator of a facility with stonnwater discharges covered by this permit shall make plans available to <br />members of the public upon reguestx unless the SWMP has been submitted to the Division. However, the pennittee may claim <br />any portion of a WMP as connTt__idenhal in accordance with 40 CFR part 2. <br />g. Annual Report <br />The pennittee will be required to submit an Ammual Report, covering January 1 through December 31 of each year, on the <br />overall compliance with the SWMP. The Annual Report shall contain, at a mttumum: <br />i) Name of pemaittee, address, phone nurrtber, and permit certification number. <br />it) A report on the facility's overall compliance with the SWMP, including a progress report on all remediation activities, <br />iil) A summary of each comprehensive stormwater facility inspection made, including date, findings, and action taken. <br />rv Results and interpretation of any stormwater monitonn perfotmed. <br />v) Certification language and signature by the permittee. ~ ee Part LD.E.2 of the permit.) <br />The re ort will be due [o the Division on or before Febmary 15 of the following yyear. The exact due date for the~ppemrittee's first <br />Annual Report will be listed in their pemut rationale. The Division reserves [he right to require additional iniomtation in the <br />report, and more frequent reports, on a case-by-case basis, as.needed. <br />A signed copy of the above report fonns(s) shall be submitted to the following address: <br />Colorado Department of Public Health & Environment <br />Water uality Control Division <br />WQCD~-BZ <br />430 Cherry Creek Drive South <br />Denver, Colorado 80246-1530 <br />h. Termination of Stormwater Pemrit Coveraee Requirement <br />i) Termination Criteria <br />a) Reclamation Permit Release: When a site has been reclaimed in accordance with the Colorado Division of Minerals <br />and Geology (CDMG) requirements and the site has been released from State reclamation requirements, the permittee <br />may request termination of the storrrrwater coverage under this perntit. <br />ri) Request for Temunation <br />When a site has been reclaimed in accordance with the CDMG requirements and the site has been released from State <br />reclamation requirements, the permittee may request termination of stormwater coverage under this permit. The Division <br />will consider termination of stonnwater coverage when: <br />a) the pemnttee has submitted a completed Inactivation Form as provided by the Division which summarizes the work <br />accomplished; <br />b All stonnwater discharges to state waters associated with mining activities have ceased and the CDMG performance <br />bond has been released; <br />d) The Division fords that the pemvttee has shown reasonable grounds consistent with the Federal and State statutes and <br />regulations for such termination; and <br />e) Fee requirements of Section 61.15 of the State Dischazge Permit System Regulations have been met. <br />Continued coverage may be required after reclamation or remediation has been completed if the Division has shown or has <br />reason to suspect that ttre stormwater drschazge may contribute to a violation of a water quality standard. <br />i. Stormwater Definitions <br />a, Best management practices (BMPs): schedules of activities, prohibitions of practices, maintenance procedures, and other <br />management practices to prevent or reduce the pollution of waters of the State. BMPs also include treatment, operating <br />procedures, and practices to control site runoff, spillage or leaks, waste disposal, or drainage from material storage. BMPs <br />include stnrctural and nonstructural controls. <br />b. Operator: the individual who has day-to-day supervision and control of activities occurring at the mine site. <br />c. Remediation, as used in this pemtit, means actions taken to reduce or eliminate the overall adverse environmental impact <br />associated with a pollutant source. The term includes actions such as repouting of surface flows, re-location or a pollutant <br />source, the addition of pollutant neutralizing or immobilizing substances, capping and re-vegetation. <br />d. Significant Materials include but aze not limited to: raw materials; fuels; materials such as metallic products; hazardous <br />substances designated under section 101(14) of CERCLA; fertilizers; pesticides; and waste products such as ashes, slag and <br />sludge that have the potential to be released with stormwater dischazge. <br />E. GENERAL MONITORING, SAMPLING, AND REPORTING REQUIREMENTS <br />1. Routine Renortine of Data <br />Reporting of the data gathered in compliance with Part LB.1 shall be on a monthly basis. Reporting of all data gathered shall comply <br />with the requirements of Part LE. (General Requirements). Monitoring results shall be s~~mmar+~ed for each month and reported on <br />Division approved dischazge moni{oring report (DMRI fomvs (EPA form 3320-1). The forms shall be mailed to the agencies listed <br />below so they aze received no later than the 28th day of the following month. If no discharge occurs during the reporting period, "No <br />Dischazge" shall be reported. <br />Revised 4/I9/2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.