Laserfiche WebLink
Michelle L. Hatcher <br />8/13/2007 <br />16. The decision of the State Engineer shall have no preced <br />force, shall not create any presumptions, shift the burder <br />a defense in any water court case or any other legal acti~ <br />initiated concerning the substitute water supply plan. Th <br />bind the State Engineer to act in a similar manner in any <br />involving other plans or in any proposed renewal of this { <br />imply concurrence with any findings of fact or conclusion <br />herein, or with the engineering methodologies used by th <br />Should you have any further comments or questions, please <br />Assistant Division Engineer in Greeley at 970-352-8712 or Joanna ~ <br />Sincerely, <br />~~~~ <br />Kevin G. Rein, P.E. <br />Chief of Water Supply <br />Attachments: Table 1 (amended), Table 2, Table 3 (amended), <br />cc: Scott Cuthbertson, Assistant Division Engineer <br />Robert Stahl, Water Commissioner District 2 <br />Colorado Division of Reclamation Mining and Safety <br />KG~ww:Lagarge West Inc. 2007 SWSP.doc <br />Page6 <br />ntial or evidentiary <br />of proof, or serve as <br />~ that may be <br />decision shall not <br />dher applications <br />an, and shall not <br />of law contained <br />Scott Cuthbertson, <br />of this office. <br />Protocol, Lease <br />