Laserfiche WebLink
<br />BOETTCHER <br />GYPSUT.4 QUARRY <br />EXHIBIT E <br />RECLAMATION PLAN <br />It is proposed that the area be reclaimed as dry rangeland. <br />This was the use of the land prior to mining operations, and <br />seems to be the only alternative at this time. <br />The reclamation work will consist of smoothing and contouring <br />the shallow walls of the quarry to conform with the ad,ioining <br />land. The work will be done with a bulldozer and will leave <br />the area with through drainage and slopes no steeper than 3:1. <br />The haul road followed an existing access road to buildings <br />and other areas of the property, as used by the surface owner. <br />This road will therefore remain in service after mining at <br />this location is completed. <br />The limited amount of topsoil that has been stockpiled will <br /> <br />1 <br />f~ <br />LJ <br /> <br />be distributed over the floor of the mined out area. The area <br />will then be seeded and fertilized according to the recommendations <br />of the Soil Conservation Service. <br />b <br />iu <br />