Laserfiche WebLink
~~ <br />Interoffice Memorandum <br />Walker to Binns <br />July 1, 1998 <br />Page 2 of 2 <br />older slide. At near the same elevation, the crest escarpments of the newer slide aze shown in <br />Pictures 9 and 10. There is rill and gully erosion of reaches above the escarpments (directly <br />below the high-flow discharge from the pond primary spillway. Although this rill and gully <br />erosion is most pronounced above the southern slide, it extends for some distance to the north, <br />and for a short distance to the south across the slope. The more extensive erosion features are <br />directly below the dischazge of the primary spillway barrel of the pond. There is a baffle plate, <br />half way up the barrel outlet, with a 6" diameter pipe and plastic downspout sleeve from the <br />barrel down the slope. The sleeve dischazges at the crest of the slide (you are standing at the <br />dischazge outlet of the sleeve in Picture 10). The soils and talus debris appear to be permeable. <br />There was a sink hole approximately 6 feet in front of you in Picture 9, near the center of the <br />escarpment in Picture 10. <br />There is a depression below the base of the primary spillway riser in the pond (Picture 8). The <br />riser is tilted slightly out of plumb, away from the embankment. A concrete "mushroom" at the <br />base indicated a spreading of concrete on an original surface during construction. This <br />depression could be the result of excavation afrer construction, subsidence, or loss of fines <br />(pumping) by seepage through the embankment. Of these three, the last two are most likely. <br />There was no evidence of spoil material indicating excavation. During construction, the base of <br />the embankment was likely compacted. However, areas under the barrel may not have been <br />properly compacted. There was no flow into or out of the depression below the riser at the time <br />of inspection (water level in the pond was at orjust below this elevation). I saw no indication of <br />seepage or loss of fines contiguous to the barrel, but my inspection was limited to the access <br />provided on the southern portion of the inlet side and heavily vegetated areas of the outslope. I <br />saw no indication of embankment failure. <br />The geology, topography, and mining history of the site suggest the area is predisposed to <br />sliding. Seepage through the pond embankment or bottom, and the primary riser discharges, <br />appeaz to have abetted the current slide. The potential for additional sliding is high, higher if the <br />pond is lefr in place. <br />Additional sliding, or failure of the pond, do not appear to present a threat to life or property. <br />Continual sliding does impose a potential for temporary degradation of water quality or mud- <br />flowdamming of the creek. Mud flows have, and would likely continue to, reach the creek (see <br />Picture 5). Such damming is not likely to endanger the road. The slide has scoured the slope to <br />bedrock (Picture 6). There just isn't a lot of material to form a substantial dam across the valley. <br />Should the dam be retained, l suggest: grouting of the base of the primary riser to arrest loss of <br />materials under the riser and through the embankment, and to prevent failure of structural <br />elements of the riser; lining the pond with bentonite; and replacement of the exit low-flow <br />discharge plastic tube with metal pipe, and the extension of the exit pipe to the base of the slope. <br />