Laserfiche WebLink
<br />2.05.31) <br />• <br />Additional equipment outby the face consists of; <br />a bulk duster, conveyors, 7200 volt primary power system, <br />water system, pumps and miscellaneous equipment as needed <br />-- to keep the mine operating properly. <br />__ hoof control for the Red Canyon N1 vine will consist of a <br />full bolt plan with bolts on a maximum of five by five foot <br />centers. The minimum length of tl~e bolts is four feet. <br />Resin bolts will be used extensively in the :•?ains and Submains. <br />Conventional bolts will be used where roof conditions warrant <br />it in the panels. Roof control will be conducted according <br />to plan approved by IQSHA. <br />Ventilation in the Mains, Submains, and panels will be developed <br />- using a double split of air. Auxiliary fans may be used in <br />• the face area to aid the ventilation. Upon retreat from the <br />panels, Grand Mesa Coal Company anticipates being able to <br />establish a bleeder system to keep the mined area free of gas. <br />All ventilation will he carried on according to plans approved <br />by MSHA. <br />Specific plans for the Red Canyon kl Mine which have been <br />submitted to DISHA are: <br /> PLAN LATEST APP2OVAL D?.mV <br />a. Roof Control October 15, 1990 <br />b. Ventilation September 26, 1990 <br />c. 't'raining :'.ay 11, 1973. <br />d. l;mergency Medical Assistant October 16, 1979 <br />e. ,Fan Stoppage Iday 11, 1979 <br />f. Smoking Prohibition July 1G, 1979 <br />g. Fire Fighting and Evacuation May 11, 1979 <br />. All are available at the mine site. <br />