Laserfiche WebLink
Metals by 200.8 <br />Method EPA200.8 Revision 5.4 <br />Matrix Spike And Matrix Spike Duplicate <br />Lab Name: Paragon Analytics <br />Work Order Number: 0603005 <br />Client Name: CEMEX, Inc. <br />ClientProject ID: A and c Pit <br />~' :- ~i41t{i ~'`*' Sample Matrix:WATER <br />_ald--I~D. A-pd ThBSe Prep Batch:1P060308-22 Sample Aliquot: 50g <br />',ji 4;"' %Molsture: N/A DCBatchID:IP060308-22-1 Final Volume: 50g <br />=a ~U0603005-2M5 <br />pcs. iz - Date Collected: 28-Feb-O6 <br />Run ID: im060308-1 a3 <br />Result Units: ugfl <br />Data Extracted:08-Mar-O6 Cleanup: NONE File Name:08MARO6A <br />Date Analyzed: 08-Mar-06 Basis: As Received <br />Prep Method: EPA200.2 <br /> <br />CASNO TargetAnalyte Sample Samp MS MS Reporting Spike MS% Control <br /> Result t]ual Result l]uai Limtt Added Rec. Limits <br />7782-49-2 SELENIUM 3 38.8 1 40 89 70 - 130% <br />7440-28-0 THALLIUM 0.2 U 1.16 0.2 1 116 70-130% <br /> <br />' Sample Matrix: WATER <br />F el D A-pit Th & Se Prep Batch: IP060308-22 Sample Aliquot: 50g <br /> <br /> <br />~ <br />%Moisture: N/A <br />DCBatchID:IP060308-22-1 <br />Final Volume: <br />50g <br />@bD 0603005-2MSD <br />u <br />:m%+ .- Date Collected: 28-Feb-O6 <br />Run lD:im060308-1a3 <br />Result Units: ug4 <br />Date Extracted: 08-Mar-O6 Cleanup: NONE Flle Name: OSMAR06A <br />Date Analyzed:OB-Mar-O6 Basis: As Received <br />Prep Method: EPA200.2 <br /> <br />Data PackagelD:im0603005-1 <br />Date Printed: Monday, March 13, 2006 Paragon Analytics Page 1 a 1 <br />LIMS Version: 5.ffi9A <br />71 <br />