Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd sheet 4 of 4 <br />K. PORTAL/SXAFT SEALING <br />Task No.~ Task Description ~ Cost (f) <br />._____._I__________________....____.____.__._..____________I~___________ <br />Subtotal (K): N <br />L. DRILL ROLE/MONITORING WELL SEALING <br />Task No.~ ~ Task Description ~ Cost (f) <br />Subtotal (L ): <br />____________ <br />M. MISCELLANEg1S RECLAMATION TASKS <br />Task No.~ Task Description ~ Cost (f) <br />_._____.I__________.._______________________________________I__.______... <br />Demolition <br />Seeding ~ f3,276 <br />Fencing <br />Mob/Demob ~ f664 <br />Subtotal (M ): 53,940 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): (4,339 <br />=zvcvv:-s:c <br />II. INDIRECT COSTS <br />A. CONTRACTOR'S OVERXEAD & PROFIT <br />Item No.~ Item Description ~ Cost (f) <br />__~..._I___~_______,~__._~__w__~___________________~I_________._. <br />1. ~ Public Liability Insurance.... 1. SSOX of dir. ~ fb7 <br />2. ~ Contractor's Performance Bond 0.975% of dir. ~ f42 <br />3. ~ Contractor's Profit........... 10.00% of dir. ~ f434 <br />4. ~ Job Superintendent.. <br />_________________________~_____._._______.________w._____.._______.,__ <br />Subtotal (A ): f543 <br />TOTAL C~ISTRUCT ION CONTRACT AMOUNT (direct plus 0 6 P): 54,882 <br />B. DNG PROJECT ADNI NI STRATTON E%PENSES <br />Item No.~ item Description ~ Cost (S) <br />____..__I___.,________________~__.____..~_....,._____..______I_w._______ <br />1. ~ Contract Prep., Eng. Fees..... 4.25% of cntr.~ 5208 <br />2. ~ Staff Admin. Expenses......... 0.75% of cntr.~ S37 <br />NET INDIRECT COST PERCENTAGE: 18.15X, Subtotal (B): f244 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): f788 <br />TOTAL PER FORIIANCE BOND AMOUNT (direct plus indi nett costs): (5,127 <br />