Laserfiche WebLink
FIRST QUARTER 2006 POND INSPECTION REPORT <br />Pond Inspection Date: March 23, 2006 <br />OPERA <br />MINE: <br />POND IDENTIFICATION <br />TYPE OF POND <br />APPROXIMATE WATER LEVEL <br />SEDIMENT (% total storage) <br />OUTFLOW (cfs) <br />FEATURES <br />EROSIONAL <br />Rills & Gullies <br />Inadequate Vegetation <br />Outlet Channel Erosion <br />Burrows <br />O[her <br />STRUCTURAL <br />Differential Settling <br />Cracks or Slides <br />Seepage <br />Other <br />APPURTENANT STRUCTURES <br />Defective Spillways <br />Dewatering Devices Clogged <br />Faulty Gates,, Etc. <br />Other <br />MAINTENANCE REQUIRED <br />TERROR CREEK COMPANY <br />TERROR CREEK LOADOUT <br />P-1 Dugout <br />Sediment Sediment <br />--0.25 ft. Dry <br /><5 % <5% <br />No No <br />No Yes <br />No No <br />No No <br />No No <br />No No <br />No No <br />No No <br />No No <br />No No <br />No No <br />No No <br />No No <br />No No <br />ADDITIONAL COMMENTS: The design sediment level is 18" below the invert of the primary spillway <br />on P-1. Dugout pond repairs were completed, mulched and seeded during third quarter 2005. No erosion <br />and some sprouting of seed. Ponds aLe maintained as designed and in accordance with the approved plan. <br />REFERENCE DRAWINGS: <br />Map 7 <br />Exh. 9, p. 11 <br />SWMP Controls: The SWMP control devices were inspected and all SWMP control devices were found to <br />be in good condition. See Map 14 for details. <br />Inspected By: <br />Under Duegtion o£ <br />James <br />Engineer No. 34286 <br />Coal Process ~ & Marketers <br />43440 Bowie Road <br />Paonla. Cobrado 81428 <br />(970) 929-5855 <br />Facsimile: (970) 929261 <br />