My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE66286
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE66286
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:12:10 PM
Creation date
11/20/2007 9:16:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1991078A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
2.05 Operation and Reclamation Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 2.05.6(3) <br />Water Monitoring Plan <br />• <br />• <br />(iv) The following monitoring plan is designed to <br />provide data which will verify that the operation will not have a <br />significant adverse impact on the surface or subsurface water which <br />is within or adjacent to the permit area. The sample points, which <br />are shown on the Hydrologic Area Map, Drawing No. 110, are as <br />follows: <br />Monitoring Station <br />Monitoring Schedule <br />B-1 Upper Bramiers Draw 1 & 5 <br />B-2 Lower Bramiers Draw 1 & 5 <br />N-lA Upper Naturita Creek 2 & 4 <br />N-2 Lower Naturita Creek 2 & 4 <br />H-2 Lower Broad Creek 1 6 5 <br />S-1 Section 33 Creek 1 & 5 <br />SP-1 Long Draw Spring 6 <br />SP-2 Section 33 Spring 6 <br />SP-3 Homestead Spring 6 <br />SP-4 Bramiers Draw Spring 6 <br />SP-5 East Homstead Spring 6 <br />SP-6 B & w Spring No. 1 6 <br />AW-3 Alluvial Well - Section 33 Discontinue <br />Bw-1 Bedrock well - Section 3 7 <br />BW-2 Bedrock Well - Section 33 7 <br />BW-3 Bedrock Well - Section 11 7 <br />AW-4 Alluvial Well - Bramiers Draw 2 & 3 <br />AW-5 Alluvial Well - Bramiers Draw 2 & 3 <br />AW-6 Alluvial Well - Naturita Creek 2 & 3 <br />AW-7 Alluvial Well - Naturita Creek 2 & 3 <br />R-1 Reed Chatfield Ditch 2 b 4 <br />Monitoring Notes: <br />Field Parameters <br />1. Field parameters quarterly. pH <br />2. Field parameters semi-annually. Conductivity <br />3. Annual fall full suite list 1. Temperature <br />4. Annual fall full suite list 2. Flow or Water Level <br />5. Annual full suite list 2 - first opportunity. <br />6. Spring & Seep survey in April or May - record field parameters <br />for springs with measurable flow - full suite required for <br />springs with flow over 5 gpm - field parameters on springs <br />that had >5 gpm flow in the fall. <br />7. Depth to water semi-annually. <br />List 1 and list 2 are contained in Exhibit 3. <br />2.05-35 <br />September 1995 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.