My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE66284
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE66284
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:12:09 PM
Creation date
11/20/2007 9:16:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Permit File
Doc Date
10/25/2002
Doc Name
Construction Quality Assurance Rpt 3
From
Cripple Creek & Victor Gold
To
DMG
Section_Exhibit Name
Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase ]Vb Weekly Summary No. 3 Page 4 003-2203 <br />Laboratory Tests <br />Golder obtained one sample of Bedding Fill (BFb-O1) and two sample of Soil Liner Fill (SLFb-OS <br />and SLFb-06) for laboratory testing. The samples tested met the requirements of the specifications <br />and results are presented in Attachment B. <br />Meetings <br />CC&V held Weekly Contractors meetings on October ISM and 8~'. Items discussed included Safety, <br />Environmental, Schedule, and CQA. The next weekly meeting will be held on October 15~', 2002 at <br />10:00 AM. <br />Golder Personnel On-Site <br />A summary of all Golder CQA personnel on site during this reporting period is presented in <br />Attachment C. <br />Sincerely, <br />Bob Nichols <br />Resident CQA Monitor <br />Phue IV63 Sept29AG12.AOC Golder Associates Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.