Laserfiche WebLink
<br />Jason M. Brothers <br />September 17, 2007 <br />Page 3 <br />gravel mining operations have ceased. Application for a decree should be made <br />three years prior to the completion of mining with the intent of obtaining a <br />decreed plan by the completion of mining. <br />8. This substitute water supply plan may be revoked or modified at any time should <br />it be determined that injury to other water rights has or will occur as a result of <br />this plan. <br />9. The decision of the State Engineer shall have no precedential or <br />evidentiary force, shall not create any presumptions, shift the burden of <br />proof, or serve as a defense in any water court case or any other legal <br />action that may be initiated concerning the substitute water supply plan. <br />This decision shall not bind the State Engineer to act in a similar manner in <br />any other applications involving other plans or in any proposed renewal of <br />this plan, and shall not imply concurrence with any findings of fact or <br />conclusions of law contained herein, or with the engineering methodologies <br />used by the Applicant. <br />10. Acceptance of these conditions shall be assumed unless a letter to the <br />contrary is received by this office, the Division Engineer (310 E. Abriendo, <br />Suite B, Pueblo, CO 81004), and the Water Commissioner (John Van <br />Oort, P.O. Box 148, Rye, Colorado 81069) within two weeks of your receipt <br />of this letter. <br />Please contact Heidi Frey of this office or Kalsoum Abbasi, Augmentation <br />Coordinator, in Pueblo at (719) 542-3368, if you have any questions concerning <br />this approval. <br />Sincerely, <br />..._~ <br />Heidi Frey, P. . <br />Water Resources Engineer <br />Attachment: Table I <br />cc: Steve Witte, Division Engineer <br />John Van Oort, Water Commissioner, District 14 <br />Division of Reclamation, Mining and Safety <br />HCF: Baxter Roatl Pit 2007 <br />