Laserfiche WebLink
1~ <br />ANNUAL SEDIMENTATION POND INSPECTION REPORT <br />Addendum to inspection report dated June 30, 2006 -Pond # 5: <br />The primary dischazge consists of a vertical stand pipe with the top opening maintained <br />open at all times allowing storm events to pass through the facility if inflows exceed the <br />pond holding capacity. The secondary dischazge gates have been welded closed to <br />prevent manual dewatering of the pond. <br />~~a~ <br />MSHA Qualified Impoundment Inspector <br />