My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE66237
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE66237
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:12:07 PM
Creation date
11/20/2007 9:14:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1989029
IBM Index Class Name
Permit File
Doc Name
APPLICATION FOR A REGULAR OPERATION 112 MLR PERMIT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />1 <br />1 <br /> Disturbance associated with mining is classified as the <br /> following: <br />t Maior Di <br />tu <br />b <br /> s <br />r <br />ance <br /> liining g,0 <br />' ;itripped 3.0 <br /> 'Copsoil Stockpiles 1.0 <br />' Moder+ite Disturbance <br /> 1?lant site 12.0 <br />' Office and Scale House 0.5 <br /> Hinor Disturbance <br />' ]teclaimed and Seeded 2.0 <br /> ]teseeding Year 2 0.5 <br />1 TOTAL DISTURBED ACREAGE Z~,O <br /> The m~.ning phases shown on Exhibit C r epresent estimates for <br /> mineral extraction in one year increments. The mining plan calls <br />' for completion in approximately 10 years. Hining and reclamation <br /> of each phase will be done contemporane ously. When mining is <br />' completed in one phase and moves to the <br />activities will begin immediately on next phase, reclamation <br />the completed phase. <br /> Grading and backsloping of shorelines will be done using <br /> stockpiled topsoil and overburden. Re seeding will be done in <br />' early spring or late fall depending on the progress of regrading. <br /> Provie;ions have been made to return the fo llowing year and reseed <br /> areas where previous reclamation was not successful. The <br /> estimated time between completion of <br />accomE~lishing final reclamation is two yea a mining phase and <br />rs <br /> . <br />Equipment used for mining will be: <br />:'•craper and 988 front end loader for stripping <br />980 front end loader for mining <br />' Portable conveyor system <br />Twin dewatering screw <br />' Processing <br />Three <br />4-1/4 <br />' Three <br />Nine <br />Equipment: <br />deck bay screen <br />foot cone crusher <br />screen wet deck <br />cell sand classifier <br />' Haul vehicles will consist of a fleet of twelve 25 ton end dumps. <br />' D-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.