Laserfiche WebLink
TABLE 19-1 <br />Projected Reclamation Schedule <br />for Seneca II-W Mine <br />Year <br />Estimated Acres Estimated Acres Net Disturbed/ <br />Disturbed Reclaimed Unreclaimed Acres <br />1989 -1995' 645.1 111.0 534.1 <br />1996-2000' 2'78.6 236.7 576.0 <br />2001-2005 410.8 619.5 367.3 <br />2006-2010 0.0 258.8 108.5 <br />2011-2015 0.0 90.2 18.3 <br />2016+ 0.0 6.3 12.0 <br />Total 1334.5 1322.52 12.0 <br />(1) These are the actual acres disturbed (does not include 96.6 acres for the TAHR) and graded as of 01- <br />01-01. <br />(2) Maximum potential acres {includes "permitted undisturbed" areas) <br />(3) Permanent facility areas <br />Note: The estimated acres for the year blocks 2001-2005 represent maximum production and may not <br />occur if sales don't permit. That is because SCC will not disturb out to the maximum disturbance boundary if <br />not required. <br />• <br /> <br /> <br />PR-OS 4 Revised 01106 <br />