My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE66153
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE66153
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:12:04 PM
Creation date
11/20/2007 9:11:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057A
IBM Index Class Name
Permit File
Doc Date
6/16/2006
Section_Exhibit Name
Tab 19 Reclamation Schedule
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Action Taken <br />Replaced topsoil and upper three <br />feet of fnal graded spoil will <br />be sampled, tested and evaluated. <br />Soil amendments will be added when <br />indicated by the results of soil <br />tests <br />Rill and gully monitoring and repair, <br />maintenance, and normal husbandry <br />activities. Revegetation monitoring, <br />Revegetation success evaluations <br />based on criteria and parameters <br />presented in Tab 22 <br />Phase III bond release is ready for <br />implementation <br />Cessation of Operations <br />Time Period <br />Years 3, 4, or 5 after permanent seeding <br />Years 1 through 8 after permanent <br />seeding <br />Years 9 and 10 after permanent seeding <br />After all disturbed areas have been <br />observed for a minimum of ten years <br />In the event a cessation of mining and reclamation operations is to occur for a period of 30 days or more, or <br />as soon as it is known that a temporary cessation will extend beyond 30 days, the Division will be notified. <br />Within 90 days after notification, a notice of intention to cease temporarily or abandon operations will be <br />submitted to the Division defining the information required in Section 4.30.1 and 4.30.2 as applicable. The <br />cessation plan will be developed in consultation with the Division. <br /> <br />9 <br />Revised 10/7/93 <br />
The URL can be used to link to this page
Your browser does not support the video tag.